• Balfour Beatty Hospital - Leonardo HD

    Balfour Beatty is a leading UK construction and engineering company, active in building healthcare infrastructure and complex projects.
  • Challenge

    Avoid having two operators on the same platform simultaneously while meeting tight deadlines and maintaining high productivity in crowded work areas. Traditional scissor lifts required multiple operators and complex repositioning, increasing time, costs, and risk of damage.
  • Solution

    Leonardo HD, paired with the Solo-Gyps accessory, allowed Flynn Interiors to work independently with a compact and intuitive design that ensured maneuverability and safety even in tight spaces.
  • Results

      • 50% reduction in installation time: a single operator manages the panels
      • Significant reduction in labor costs
      • Maximum safety and regulatory compliance
      • Improved overall efficiency, reducing risk of damage
  • Operational advantages for the site:

      • Low step and easy access to reduce fatigue and accidents

      • Superior maneuverability in tight spaces

      • Large volumes completed without interruptions